Complete Remediation Solutions supported our sister company, Hunter Environmental Services Ltd, in the removal of a former piling platform embankment as part of the Victoria North regeneration scheme.
Working within a complex brownfield environment, 11,450m³ of material was excavated, tested, and classified in accordance with WM3 guidance. Non-hazardous made ground with identified hazardous hotspots was carefully managed through on-site testing and segregation, ensuring compliant and cost-effective disposal.
The use of 3D machine control enabled precise excavation to design levels, reducing over-dig and improving efficiency.
Removal of existing piling platform embankment
Completion of working platforms to design levels
WM3 soil testing for waste classification
On-site rapid testing to support waste segregation
Hazardous and non-hazardous off-site disposal
Off-site disposal of 11,450m³